J-S&A assessed the condition of Trinity Episcopal Church's exterior masonry. Inspection revealed the upper portion of the steeple was in danger of catastrophic collapse and the crowning cross was teetering. The steeple was stabilized for the winter, and the cross was removed. Over the following spring, the degraded steeple masonry was deconstructed and rebuilt using methods consistent with its erection to ensure longevity and safety.